Integrated Quality, Safety, and Environmental Governance towards Sustainable Software Development
DOI:
https://doi.org/10.83829/q08a8n60Keywords:
Integrated Management System, Software Development, Risk Management, Quality, Safety & Environment, Continuous Improvement, Plan-Do-Check-Act, Quality AssuranceAbstract
Risk is increasing in complexity in software development, impacting product quality and user satisfaction. This research develops and validates an IMS for Quality, Safety and Environment (QSE), and ISO/IEC 25000/25010 software quality and ISO/IEC 27005 risk standards throughout the software development lifecycle. The IMS was developed using MIE (UKRLP 10101921) based on conceptual architecture, and validated by experts (n=14) and a pilot study spanning 3 releases (T0, Baseline; T2, +6 Months). The IMS incorporates the Deming Cycle (Plan, Do, Check, Act), Management, Support & Realization processes, Failure Tree Analysis, ergonomic evaluations of workstations, and the ISO/IEC 25000 quality matrix. Experts demonstrated that the architecture is valid (mean rating 4.36-4.71/5.0, where 4.0 and above indicates validity). The pilot study spanning 3 software releases demonstrated an increase in quality attributes: portability (30.0 pts, 88.0), maintainability (23.4 pts, 84.8), reliability (19.7 pts, 91.2), performance efficiency (18.5 pts, 86.5) and usability (18.5 pts, 85.0). An improvement in ergonomic risk of workstations was also found (61.5%), including a reduction in post-release software defects (54.2%), QSE audit time (52.4%), average recovery time (48.6%), and carbon footprint of build/test processes (29.8%).
References
COHENDET P., LLERENA P. and MULTEL B., “Flexibility and coherence of
production data, in TERSSAC G. DE and DUBOIS P. (eds.), The New
Rationalizations of Production, Cépaduès-Editions, pp. 25-41, 2002.
COOPER R., "The strategy performance link in product innovation", R&D
Management, vol. 4, pp. 247-259, 2002.
CRAWFORD K., The Strategic Project Office: a Guide to Improving Organizational
Performance, Marcel Dekker, New York, 2002.
DINSMORE C., Human factors in project management, American Management
Association, New York, 1990.
DURAND R., GOMEZ P.Y. and MONIN P., "Strategic management facing the
options theory", French Management Review, vol. 28, no. 137, pp. 45-60, 2002.
FLANNES S. and LEVIN G., People Skills for Project Managers, Management
Concepts, Vienna, 2001.
JOFFRE P., AURÉGAN P., CHÉDOTEL F. and TELLIER A., Strategic Management
by project, Economica, 2006.
PICQ T., Manage a project team, Dunod, 1999.
PINEAU S. [2011], "The evolution of the project manager profession and ISO 21500", no. 112.
PINTO J. K. and SLEVIN D. P., "Critical success factors across the project life cycle
", Project Management Journal, no. 3, pp. 67-75.
TREPO G. and ZANNAD H., "The socio-organizational issues of project management
", Research Paper of the HEC Group, CR 625.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Diana Omar ElRabih

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Articles published in Jurnal Tifani are licensed under a Creative Commons Attribution-ShareAlike 4.0 International License (CC BY-SA 4.0). Authors retain the copyright of their work.

















